On June 14, as the car whistled, three heavy trucks loaded with 13 sets of desuperheater and pressure reducer products slowly left the factory. So far, the supply of 22 sets of desuperheater and pressure reducer groups and simulated steam engine desuperheater and pressure reducer used in China's No. 4 aircraft carrier experimental device has been successfully completed.
On May 28, 2024, the 703rd Institute sent a quality expert group to our factory for pre-shipment acceptance. After a series of rigorous inspections and tests, all 13 sets of products passed the inspection and were allowed to be shipped.
In June 2021 and March 2023, the company won the bid for the steam load system desuperheater and pressure reducer group project of the 703rd Institute of China Shipbuilding Industry Corporation twice, with a total supply amount of more than 4.5 million yuan. Among them, the 9 sets of products signed in 2021 have completed on-site acceptance in 2023.
The perfect delivery of this product has opened up a new track for Meiya people to seize the military industry. The company will take technological innovation as the driving force for development, seize opportunities, empower momentum, and move towards "new", injecting new impetus into the development of the Meiya brand in various fields.




